MOCVD@SDSMT
Hi, my name is Sini. I am dangerous, but I am safe to work with if you follow all my rules.
Thursday, October 24, 2019
10/24/19 - Disconnected TMIn bubbler (X-36273). Made new tubing connecting TMIn bubbler #1 (X-36273) and TMIn bubbler #2 (S-21123-246) in series. Also installed a manual valve between INPV3 and the connecting line from TMIn#1 outlet and TMIn#2 inlet, which enables us to flush out the lines.
Friday, September 27, 2019
9/27/19 - Replaced old TMIn bubbler (S-21123) with new TMIn bubbler (X-36273).
Wednesday, September 18, 2019
9/18/19 - Removed vent line from manifold, cleaned TMIn run/vent valve. Swapped As-liquid and TMIn run/vent valves and re-attached vent line.
Thursday, August 22, 2019
8/22/19 - Installed new t-butyl-phosphide (PL) bubbler. Set temperature to 17°C.
Friday, August 9, 2019
8/9/19 - New PH3 cylinder installed, pressure 500 psi, set line pressure to 20 psi.
8/9/19 - New AsH3 cylinder installed, pressure 220 psi, set line pressure to 20 psi.
8/8/19 - Replaced motor on oil purifier.
8/9/19 - New AsH3 cylinder installed, pressure 220 psi, set line pressure to 20 psi.
8/8/19 - Replaced motor on oil purifier.
Friday, March 15, 2019
3/15/19 - Disconnected old charcoal scrubber and connected new Jupiter Scientific scrubber.
Friday, March 1, 2019
3/1/2019 - Changed K-40 fitting that connects to rotary drive to a modified fitting with N2 flush.
Subscribe to:
Posts (Atom)